Cost of Ownership of Automated Measuring Systems

Author: Dave Curtis on behalf of Source Testing Association

Free to read

This article has been unlocked and is ready to read.

Download

Industrial plants with the most potential to pollute to air, water and waste in the EU tend to fall under the scope of EU directives. The recently adopted Industrial Emissions Directive (IED), harmonises requirements across the EU (with more prescriptive BREF guidance) and integrates and supersedes the requirements of the Integrated Pollution Prevention Control (IPPC) Directive, Large Combustion Plant Directive (LCPD) and Waste Incineration Directive (WID).  The IED continues to adopt many of the philosophies used in the UK such as permits which consider emission limits and monitoring requirements in light of Best Available Techniques (BAT) with central guidance on what should be considered as industry specific BAT.

One aspect of the IED and BREF guidance is the increasing use of Automatic Measuring Systems (AMS) sometimes referred to as CEMs (Continuous Emissions Monitoring).

A question that is frequently asked is “what is the cost of fitting an AMS to a plant?” Below is a detailed case study supplied by EPRL on a plant they recently fitted out with a new AMS. 

Later in the article we have shown costs of an AMS on a Cement Plant run by LaFarge Tarmac in the UK.

 

Case Study

The Process

Energy Power Resources Limited (EPRL) operates a mix of Large Combustion Plants and waste co-incinerators that burn renewable fuels at electrical power stations. Within England the EPRL stations fall within A1 sections of the Environmental Permitting Regulations and are therefore subject to control by the Environment Agency (EA). The EA issues operating permits that require the stations to continuously measure stack emissions by using approved equipment, MCERTS instruments, and to satisfy the requirements of BS EN14181 Stationary Source Emissions — Quality Assurance of Automated Measuring Systems (AMS) to ensure the performance of those instruments.

It was decided that one of the EPRL waste co-incinerator sites would have a new suite of AMS, or CEM, instruments installed.  To meet permit requirements the site needs to continuously monitor and report emissions of the following species:

• Hydrogen Chloride (HCl)

• Sulphur dioxide (SO2)

• Carbon monoxide (CO)

• Oxides of nitrogen (NOx)

• Total Organic Carbon (TOC)

• Particulates

In addition monitoring of peripheral species, oxygen (O2) and moisture (H2O), is needed to correct the measured concentrations of the reported species to standard conditions.  Processing of the AMS data is typically undertaken by a specialised software programme known as a Data Acquisition and Handling System (DAHS).

 

Description of the Selected AMS Instruments

During the re-equipment planning the performance and condition of the in-use particulate monitor were good, the unit was therefore retained and its output integrated into the new AMS system.

With the range of gas species that need to be measured at a waste co-incinerator it was decided that a unit using the Fourier Transform Infra Red (FTIR) principle would be used.  An FTIR unit has the added advantage of measuring H2O and the MCERTS certificate for the unit selected also covered an integrated O2 monitor. MCERTS instruments for measuring TOC emissions use the Flame Ionisation Device (FID) technique and the FTIR supplier was also able to provide a suitable unit.

An upgrade to a new MCERTS version of a commercially available DAHS programme was carried out concurrently with installation of the AMS instruments.

The AMS instruments selected need a considerable electrical power supply as the stack sample is handled ‘hot and wet’; it is extracted, transferred and analysed at a temperature of 180°C. The instruments also need to be housed to provide a suitable operating environment, require a high quality instrument air supply, the FID continuously uses fuel gas, the FTIR needs a nitrogen supply and all instruments use test gases to check for drift in measurement. A new cabin was obtained to house the AMS units and all the necessary services were incorporated into that building.

Following installation of an AMS, the system’s performance has to be tested by a UKAS accredited and MCERTS certified test laboratory to ensure BS EN 14181 requirements are met, which involves a Quality Assurance Level 2 (QAL2) test. This consists of a structured assessment of the instrument installation work and individual unit performance, followed by parallel testing to produce a calibration function for each species so that monitoring by the AMS in its entirety is proven to be of acceptable accuracy.

Cost of installation

Ongoing running costs

AMS instruments typically undergo routine maintenance at six monthly intervals to ensure that their performance is consistent, normally undertaken by the company that supplied the units. A support contract is usually put in place so that rapid response is available from AMS supply companies if external support is needed for a system defect. 

To continue to meet BS EN 14181 requirements it is necessary for the AMS installation to undergo an Annual Surveillance Test (AST) by an accredited test laboratory, which checks for stability of the instrument results and ensures the continued validity of the calibration functions derived during the preceding QAL2. Prior to an AST or QAL2 functional tests are carried out to prove the AMS is operating satisfactorily, those tests may involve the support of the instrument supply company.  QAL2 tests are repeated every third year at a waste co-incinerator and at five yearly intervals at large combustion plants.

Between the annual BS EN 14181 tests the operator undertakes internal QAL3 tests that check for span and zero drift of the AMS instruments. In addition to costs for test materials, such as gases for each monitored species, the QAL3 tests require a skilled technician to carry out the work and assess the results. The need for minor routine maintenance tasks such as replacement of gas cylinders and confidence building system health checks is also likely. Excluding unplanned rectification, this site work might take four man hours per week.

Operators are likely to incur a further and less direct cost of AMS ownership.  Coordination of AMS installation work, resolution of system errors and control of annual tests will probably be undertaken by an internal or external specialist.  Costs for the individual in that post are dependent on several factors but they may be significant in comparison to other more obvious ongoing costs.

 

 The prime AMS sample extraction probe on the right and the extraction probe for a ‘hot spare’ AMS system on the left

 

Costs of operation on a cement process

Below is an example of the operating costs of an AMS system fitted to a cement plant in the UK.

 

Free to read

This article has been unlocked and is ready to read.

Download


Digital Edition

AET 28.4 Oct/Nov 2024

November 2024

Gas Detection - Go from lagging to leading: why investment in gas detection makes sense Air Monitoring - Swirl and vortex meters will aid green hydrogen production - Beyond the Stack: Emi...

View all digital editions

Events

Safety & Health Expo 2024

Dec 02 2024 London, UK

Valve World Expo

Dec 03 2024 Dusseldorf, Germany

Aquatech China 2024

Dec 11 2024 Shanghai, China

Abu Dhabi Sustainability Week

Jan 12 2025 Abu Dhabi, UAE

World Future Energy Summit

Jan 14 2025 Abu Dhabi, UAE

View all events