Water/Wastewater
Anglian Water fixes wastewater treatment blockages
Nov 12 2010
Basildon Sewage Treatment Works recently had trouble with its pumping system, which affected the flow of water for 150,000 people who rely on the service, the Engineer reported.
Anglian Water replaced an inefficient pump in order to prevent blockage problems from occurring again.
Speaking with the news provider, asset engineer Gary Wakley, based at Colchester Sewage Treatment Works, said: "After three months of operating almost entirely on the trial Flygt pump it was opened and inspected. There was no sign of wear at that point."
This prompted Anglian Water to install two more Flygt pumps at the site.
Residents in Wing and Morcott who have been interested in learning more about a new nearby wastewater treatment works were able to have a guided tour of Wing Water Treatment site earlier this month, following its opening in February 2010.
Posted by Joseph Hutton
Digital Edition
AET 28.2 April/May 2024
May 2024
Business News - Teledyne Marine expands with the acquisition of Valeport - Signal partners with gas analysis experts in Korea Air Monitoring - Continuous Fine Particulate Emission Monitor...
View all digital editions
Events
Jul 10 2024 Birmingham, UK
Jul 21 2024 Cape Town, South Africa
Australasian Waste & Recycling Expo
Jul 24 2024 Sydney, Australia
Jul 30 2024 Jakarta, Indonesia
China Energy Summit & Exhibition
Jul 31 2024 Beijing, China