• HanWha Solutions Plant Manager: Reliable CEM Systems Bring Productivity and Stability to my Life

CEMS

HanWha Solutions Plant Manager: Reliable CEM Systems Bring Productivity and Stability to my Life

Sangyeon Hwang,  an Environment and Safety Team CEMS Manager at the HanWha plant in Yeosu, Korea explains how important a reliable monitoring system is to his company.

“In Korea, all stack CEMs are online and monitored in real time by the authorities. That means that even a slight over-emission could cause big problems for the company. If I had an unreliable CEM[…] I could not sleep at night. Having reliable CEMs brought me not only productivity but also stability in my life.”

Hwang decided to try monitoring system from Gasmet, because his current system wasn’t reliable enough. His monitoring system just couldn’t keep up with the increasing needs of the plant and changing regulations. Hwang has been impressed with Gasmet systems because he “can see the evidence of the results.” 

Read the full case story on Gasmet’s website for the evidence.


Digital Edition

IET 35.2 March

April 2025

Air Monitoring - Probe Sampling in Hazardous Areas Under Extreme Conditions - New, Game-Changing Sensor for Methane Emissions - Blue Sky Thinking: a 50-year Retrospective on Technological Prog...

View all digital editions

Events

FORUMESURE

Apr 22 2025 Hammamet, Tunisia

Korea Lab 2025

Apr 22 2025 Kintex, South Korea

Analytica Anacon India & IndiaLabExpo

Apr 23 2025 Mumbai, India

Analitika Expo 2024

Apr 23 2025 Moscow, Russia

Solar & Energy Storage Summit 2025

Apr 23 2025 Denver, CO, USA

View all events