• HanWha Solutions Plant Manager: Reliable CEM Systems Bring Productivity and Stability to my Life

    CEMS

    HanWha Solutions Plant Manager: Reliable CEM Systems Bring Productivity and Stability to my Life

    Sangyeon Hwang,  an Environment and Safety Team CEMS Manager at the HanWha plant in Yeosu, Korea explains how important a reliable monitoring system is to his company.

    “In Korea, all stack CEMs are online and monitored in real time by the authorities. That means that even a slight over-emission could cause big problems for the company. If I had an unreliable CEM[…] I could not sleep at night. Having reliable CEMs brought me not only productivity but also stability in my life.”

    Hwang decided to try monitoring system from Gasmet, because his current system wasn’t reliable enough. His monitoring system just couldn’t keep up with the increasing needs of the plant and changing regulations. Hwang has been impressed with Gasmet systems because he “can see the evidence of the results.” 

    Read the full case story on Gasmet’s website for the evidence.


    Digital Edition

    IET 35.2 March

    April 2025

    Air Monitoring - Probe Sampling in Hazardous Areas Under Extreme Conditions - New, Game-Changing Sensor for Methane Emissions - Blue Sky Thinking: a 50-year Retrospective on Technological Prog...

    View all digital editions

    Events

    Oil & Gas Asia

    May 10 2025 Karachi, Pakistan

    SETAC Europe

    May 11 2025 Vienna, Austria

    ENVEX 2025

    May 11 2025 Seoul, South Korea

    IFAT Eurasia

    May 15 2025 Istanbul, Turkey

    View all events

    Congratulations...
    We will send you the latest eBulletin as soon as its ready..
    Sign up to Envirotech for FREE.
    Register and get the eBulletin, a Monthly email packed with the latest environmental products, news and services. Join us and get the latest information first.